Maintenance
Please be advised: The Ministry of Transportation has advised that lane closures are expected on Highway 115 from Boundary Road to Highway 7 from June 24th to August 27th, 2024.
The Township of Cavan Monaghan Public Works Departments organizes summer and winter maintenance operations for roadways and sidewalks.
Summer Maintenance Operations |
Summer maintenance generally occurs between May 1 and October 31. There are a number of operations that the Public Works Department completes during the summer season. Some of these summer operations include:
Road system and work are set out on a biweekly basis for ongoing maintenance. |
Winter Maintenance Operations |
Winter maintenance generally occurs between November 1 and April 30. The Township of Cavan Monaghan is responsible for sanding, salting, plowing and snow removal operations for its roads and sidewalks. The major objectives for the winter maintenance operations program are:
The policy of the Municipality is to sand during freeze-thaw cycles. Snow plowing occurs after snow accumulation reaches a level of 8 cm. The Township's call-out process includes a start time between 4:00 a.m. and 5:00 a.m., and routes will be completed within 4-5 hours. Priority is given to school bus routes and high-traffic volume roadways. |
If you have a complaint and/or concern, please contact the Public Works Department at 705-932-9323.