The Township of Cavan Monaghan Public Works Departments organizes summer and winter maintenance operations for roadways and sidewalks.

 Summer Maintenance Operations

Summer maintenance generally occurs between May 1 and October 31. There are a number of operations that the Public Works Department completes during the summer season. Some of these summer operations include:

  • Roadside maintenance (mowing, ditching, shouldering)
  • Street sweeping
  • Resurfacing (surface treatment, asphalt paving, slurry seal)
  • Gravelling
  • Dust control
  • Culvert replacement
  • Re-grading
  • Miscellaneous road repairs

Road system and work are set out on a biweekly basis for ongoing maintenance.

 Winter Maintenance Operations

Winter maintenance generally occurs between November 1 and April 30. The Township of Cavan Monaghan is responsible for sanding, salting, plowing and snow removal operations for its roads and sidewalks. The major objectives for the winter maintenance operations program are:

  • Reduce the hazards of winter road, street, and sidewalk conditions to motorists and pedestrians
  • Reduce economic loss to the community and industry caused by inability for people to access the workplace
  • Facilitate the handling of emergencies by fire, police, ambulance, and officials
  • Maintain safe, passable school bus routes

The policy of the Municipality is to sand during freeze-thaw cycles. Snow plowing occurs after snow accumulation reaches a level of 8 cm. The Township's call-out process includes a start time between 4:00 a.m. and 5:00 a.m., and routes will be completed within 4-5 hours. Priority is given to school bus routes and high-traffic volume roadways.  

 If you have a complaint and/or concern, please contact the Public Works Department at 705-932-9323.

Good morning Bernadette;

 

I am pleased to inform you that your project described in the Sidewalk Café Grant Application for the property located at 28 King Street East, has been approved. As per PEB – 2024-31 - 2024 Community Improvement Plan Grant Program Recipients, you have been approved for a MCIP Sidewalk Café Grant of $800.00.  Receipt of the grant is subject to the execution of the Financial Incentive Program Agreement between the recipient(s) and the Township of Cavan Monaghan.  I will be sending that to you shortly.

If you have any questions or comments, please do not hesitate to reach out to the CIP Implementation Co-ordinator Brigid Ayotte by telephone: 705-932-9339 or by email: bayotte@cavanmonaghan.net

 

Congratulations on the approval of your CIP project.  The grant will be provided upon successful completion of the approved project.  Application requirements identified in Section 7.4.1 in the Millbrook CIP apply to all projects as well as provisions identified in Section 5.3.7.5 of the MCIP.  As per Section 5.1 of the MCIP, all projects must comply with the Township’s 2017 Detailed Streetscape and Design Guidelines for Downtown Millbrook.

 

As always Bernadette, I look forward to working with you!

 

Hope you have a safe and Happy Canada Day and long weekend!

 

Kind regards,